
12/03
67.31 M2
Bedrooms 2
Floor 12
30 645 747 $
https://zeenat-hsproperty.com/contact/
https://zeenat-hsproperty.com/wp-content/uploads/2021/09/white_paper_english.pdf
26.2 KB
08/10
56.65 M2
Bedrooms 8
Floor 10
78 645 747 $
https://zeenat-hsproperty.com/contact/
https://zeenat-hsproperty.com/wp-content/uploads/2021/09/white_paper_english.pdf
26.2 KB
07/02
55.14 M2
Bedrooms 3
Floor 7
51 308 684 $
https://zeenat-hsproperty.com/contact/
https://zeenat-hsproperty.com/wp-content/uploads/2021/09/white_paper_english.pdf
26.2 KB
09/02
68.27 M2
Bedrooms 3
Floor 9
44 836 528 $
https://zeenat-hsproperty.com/contact/
https://zeenat-hsproperty.com/wp-content/uploads/2021/09/white_paper_english.pdf
26.2 KB
Load More
No Data
Registered broker, Dubai Land Department
Through H&S Real Estate, a licensed UAE brokerage
A property consultant to UAE buyers and investors
Of my buyers purchase without ever visiting the UAE




Two emirates, two different markets. Dubai moves faster and resells more easily. Abu Dhabi is quieter, more end-user led, and earlier in its cycle.
Seven steps from first call to keys in hand. You can complete
every one of them without getting on a plane
A first call
Your shortlist
The walkthrough
Reservation
Contracts and registration
Payment plan runs
Handover and snagging
Yes. Non-residents can buy freehold property in designated areas, and you do not need a UAE residence visa to do it. Between 20 and 30 percent of my buyers have never visited before signing.
No. Reservation, contracts and payments can all be handled remotely. That is exactly why I film every project.
Narrow the field and tell you the truth about what is left. Anyone can send you a brochure. My job is to rule out the projects that do not serve what you are trying to achieve, and be honest about the trade-offs on the ones that do.
An agent sells you what is on their list. A property consultant starts with what you are trying to achieve and works backwards, which sometimes means saying none of the current options fit. I advise first and sell second.
You pay in instalments across the construction period instead of in one lump sum. Usually a deposit on booking, several instalments during construction, and a final payment on handover. The split varies by project, so read the schedule with its dates rather than trusting a headline like 60/40.